Page 196 - Demo
P. 196


                                    Pencapaian Proyek Utama Production and Project Tahun 2024Production and Project Achievements in 2024ProyekProjectPenjelasan Singkat dan Kemajuan Proyek Hingga Akhir Tahun 2024Brief Description and Project Progress Up to the End of 2024Rokan Well Development SLO Phase 4 Aktualisasi eksekusi RKAP 2024 per Desember 2024: Aktual 47.33% vs Rencana 44.75% Pemboran YTD Desember 2024:%u2022 Tajak: 45 Aktual vs 44 Rencana%u2022 Pemboran Selesai: 46 Aktual vs 43 Rencana%u2022 Put on Production (POP): 58 Aktual vs 50 RencanaActualization of RKAP 2024 execution as of December 2024: Actual 47.33% vs Planned 44.75%Drilling YTD December 2024:%u2022 Drill bits: 45 Actual vs 44 Planned%u2022 Drilling Completed: 46 Actual vs 43 Planned%u2022 Put on Production (POP): 58 Actual vs 50 PlannedRokan Well Development HO Phase 3 Progres Aktual s.d 31 Desember 2024 Rencana 42.85% VS Aktual 45.28% (+2.42%) denganscope YTD Desember 2024:%u2022 RFD: 119 Aktual vs 108 Rencana%u2022 Spud: 108 Aktual vs 105 Rencana%u2022 Pemboran Selesai drill: 106 Aktual vs 102 Rencana%u2022 Put on Production (POP): 103 Aktual vs 95 RencanaActual Progress up to December 31, 2024 Planned 42,85% VS Actual 45,28% (+2.42%) withscope YTD December 2024:%u2022 RFD: 119 Actual vs 108 Planned%u2022 Spud: 108 Actual vs 105 Planned%u2022 Drilling Completed: 106 Actual vs 102 Planned%u2022 Put on Production (POP): 103 Actual vs 95 PlannedRokan Well Development SLO Phase 3 Progres fisik per Desember 2024: Aktual 25.82% vs Rencana 24.84% (+0.98%) Pemboran YTD Desember 2024:%u2022 Tajak: 71 Aktual vs 69 Rencana%u2022 Pemboran Selesai: 71 Aktual vs 69 Rencana%u2022 Put on Production (POP): 82 Aktual vs 70 Rencana%u2022 Progress upgrade gathering station:%u2022 Kotabatak GS: 56.34%%u2022 Balam GS: 39.32%%u2022 Balam SS: 17.43%%u2022 OKB SS: 12.27%Physical progress as of December 2024: Actual 25.82% vs Planned 24,84% (+0,98%)Drilling YTD December 2024:%u2022 Drill bits: 71 Actual vs 69 Planned%u2022 Drilling Completed: 71 Actual vs 69 Planned%u2022 Put on Production (POP): 82 Actual vs 70 Planned%u2022 Progress of upgrade gathering station:%u2022 Kotabatak GS: 56,34%%u2022 Balam GS: 39,32%%u2022 Balam SS: 17,43%%u2022 OKB SS: 12,27%OPL Struktur E-MainOPL E-Main StructureTotal Progres: Aktual 30.4% vs Rencana 30.4%Pemboran:%u2022 Pemboran Selesai ED-14 drilling 100%%u2022 Pemboran Selesai ED-15 (Completion by HWU), 12 Juli 2024%u2022 Pemboran Selesai KUPL EQD-6 drilling 100% 7 Juli 2024Fasilitas Produksi:%u2022 Pekerjaan Selesai install flowline & hook up spool ED-14%u2022 Pekerjaan Selesai install flowline & hook up spool ED-15%u2022 Pekerjaan Selesai install last spool KUPL EQD-6%u2022 Pekerjaan Selesai fabrikasi & instalasi conductor support EF-10%u2022 Pekerjaan Selesai WHCP modification%u2022 Pekerjaan Selesai material & fabrikasi deck EF-10%u2022 Pekerjaan Selesai fabrikasi & Installation EF-10%u2022 Pekerjaan Selesai conductor support fabrication EB-13,%u2022 Pekerjaan Selesai flowline fabrication EB-13%u2022 Pekerjaan Selesai material deck EB-13 Laporan Tahunan %u2022 Annual Report 194HULU ENERGI
                                
   190   191   192   193   194   195   196   197   198   199   200