Page 253 - Demo
P. 253


                                    PENCAPAIAN TARGET TAHUN 20232023 TARGET ACHIEVEMENTAsumsi-asumsi yang Digunakan serta Proses Perumusan Target Tahun 2023Target-target kinerja tahun buku 2023 disusun dalam RKAP 2023 dan disahkan oleh Dewan Komisaris melalui surat No.048/DK-PHE/2023-s0 tanggal 12 Juli 2023. Penetapan target-target dalam RKAP telah mempertimbangkan berbagai faktor internal dan eksternal, seperti ICP sebesar US$90/bbl dengan nilai tukar Rp14.800.Pencapaian Target Tahun 2023Assumptions Used and the Process of Formulating 2023 TargetsPerformance targets for the 2023 financial year have been formulated in the 2023 RKAP and have been ratified by the Board of Commissioners through letter No.048/DK-PHE/2023-s0 dated July 12, 2023. The setting of targets in the RKAP has taken into account various internal and external factors, such as ICP of US$90/bbl with the exchange rate of Rp14,800.2023 Target AchievementPencapaian Target Operasi Tahun 2023Achievement of 2023 Operating TargetsPerihalSubjectSatuanUnitRealisasi 20232023 RealizationTarget 20232023 TargetPencapaian Realisasi Terhadap Target 2023Realization Against 2023 Target(%)(1) (2)Eksplorasi/ ExplorationPengeboran EksplorasiExploration DrillingSumur 20 32 62,50Penambahan Sumber Daya 2C2C Resource AdditionMMBOE 488,15 289,72 168,49Survei Seismik 2D2D Seismic Surveykm - 560 -Survei Seismik 3D3D Seismic Surveykm2 1.512 1.911 79,12Pengembangan/ DevelopmentPemboran PengembanganDevelopment DrillingSumur 799 943 84,73Kerja Ulang Pindah Lapisan (KUPL)Layer Move Rework (KUPL) Sumur 837 688 121,66Tambahan Cadangan 1PAdditional 1P ReserveMMBOE 450,30 411,59 109,40Produksi Migas/ Oil and Gas ProductionTotal Produksi Migas*Total Oil and Gas Production*MBOEPD 1.043,73 1.072,22 97,34Total Produksi Minyak*Total Oil Production*MBOPD 566,35 595,40 95,12PT Pertamina Hulu Energi %u2022 Annual Report 251
                                
   247   248   249   250   251   252   253   254   255   256   257