Page 186 - Demo
P. 186


                                    ProyekProjectPenjelasan Singkat dan Kemajuan Proyek Hingga Akhir Tahun 2023Brief Description and Project Progress Up to the End of 2023B-11 Blok ONWJ %u2022 Drilling (2 dari 7 sumur selesai):%u2022 BG-12 dan BG-13 selesai pada bulan Mei 2023.%u2022 Workover (1 dari 5 sumur telah selesai di tahun 2022)%u2022 Fasilitas:%u2022 Penyelesaian pemasangan last spool BC-4.%u2022 Penyelesaian instalasi flowline dan conductor BG-12 dan BG-13, termasuk last spool.%u2022 Penyelesaian instalasi flowline dan conductor BL-10, belum termasuk last spool.%u2022 Drilling (2 out of 7 wells completed):%u2022 BG-12 and BG-13 were completed in May 2023.%u2022 Workover (1 out of 5 wells completed in 2022)%u2022 Facility: %u2022 Completion of BC-4 last spool installation.%u2022 Completion of BG-12 and BG-13 flowline and conductor installations, including last spool.%u2022 Completion of flowline and conductor BL-10 installation, excluding last spool.ABG-GTR Stage-1 Tahap-2ABG-GTR Stage-1 Stage-2%u2022 Sumur ABG-C sudah tajak pada tanggal 30 Juli 2023 dan release 9 September 2023.%u2022 Sumur ABG-C1 selesai pada tanggal 28 September 23, dan release 8 November 2023.%u2022 Progress flowline ABG-C 97,14 % dan ABG-C1 : 97,08%.%u2022 Progress EPC SP ABG progres 14,21% dari Plan 41,21%.%u2022 The ABG-C well was excavated on July 30, 2023, and released on September 9, 2023.%u2022 The ABG-C1 well was completed on September 28, 2023, and released on November 8, 2023.%u2022 Progress flowline ABG-C 97.14% and ABG-C1 97.08%.%u2022 EPC SP ABG progress 14.21% progress compared to Plan 41.21%.OPLL Sanga Sanga Fase-2OPLL Sanga Sanga Phase-2%u2022 Pemboran selesai 34 sumur (YTD 2023).%u2022 WO selesai 38 sumur.%u2022 Pemasangan flowline selesai 34 sumur. %u2022 Progress fasilitas produksi: %u2022 Relokasi 4 compressor eksisting: Progress 20% - 88%. %u2022 Purchasing compressor: Award done, 60 weeks delivery. %u2022 PO issued paket B HP 25 September 2023, delivery pada 18 November 2024. %u2022 PO issued paket A VLP 14 Sep 23, delivery pada 7 November 2024.%u2022 Drilling completed 34 wells (YTD 2023).%u2022 WO completed 38 wells.%u2022 The installation of flowlines completed 34 wells. %u2022 Production facility progress: %u2022 Relocation of 4 existing compressors: Progress 20% - 88%.%u2022 Purchasing compressor: Award done, 60 weeks delivery. %u2022 PO issued for package B HP on September 25, 2023, delivery on November 18, 2024.%u2022 PO issued for package A VLP on September 14, 2023, delivery on November 7, 2024.OPLL 2A MahakamOPLL 2A Mahakam Block%u2022 Sumur spud: 18 vs Plan 18 (ITD aktual 54)%u2022 Sumur delivered: 23 vs Plan 23 (ITD aktual 54)%u2022 Sumur connected: 24 vs Plan 23 (ITD aktual 54)%u2022 Put on Production (POP): 21 vs Plan 23 (ITD aktual 51)%u2022 Peciko 8B progress: 59,48% vs 62,25%.%u2022 Spud wells: 18 vs Plan 18 (ITD 54)%u2022 Wells completed: 23 vs Plan 23 (ITD 54)%u2022 Wells connected: 24 vs Plan 23 (ITD 54)%u2022 Put on Production (POP): 21 vs Plan 23 (ITD 51)%u2022 Peciko 8B progress: Actual 59.48% vs Plan 62.25%.184 Laporan Tahunan %u2022 PT Pertamina Hulu EnergiPEMBAHASAN DAN ANALISIS MANAJEMENMANAGEMENT DISCUSSION AND ANALYSIS 4 5 6 7
                                
   180   181   182   183   184   185   186   187   188   189   190