Page 173 - Demo
P. 173


                                    DeskripsiSubject 2023 2022Kenaikan (Penurunan)Increase (Decrease)NominalPersentasePercentage(%)Realisasi Pemboran Sumur Eksplorasi (unit)Realization of Exploration Well Drilling (units) 20 17 3 17,65 %uf0e1Realisasi Survei Seismik 2D (km)Realization of 2D Seismic Survey (km) - 1.818 (1.818) (100,00) %uf0e2Realisasi Survei Seismik 3D (km2) superscriptRealization of 3D Seismic Survey (km2) superscript 1.512 371 1.141 307,60 %uf0e1Realisasi Penambahan Contingent Resources (2C)Realization of Additional Contingent Resources (2C)Minyak (MMBO) Oil (MMBO) 219,90 161,46 58,44 36,19 %uf0e1Gas (BSCF)Gas (BSCF) 1.554,19 1.065,45 488,74 45,87 %uf0e1Migas (MMBOE) Migas (MMBOE)Oil and Gas (MMBOE) 488,15 345,36 142,79 41,35 %uf0e1Kinerja Operasi Kegiatan Eksplorasi Performance of Exploration Operation Activities Secara umum kinerja operasi Kegiatan Eksplorasi PHE Subholding Upstream pencapaiannya melebihi target, jika dibandingkan dengan pencapaian di tahun 2022, realisasi Pemboran Sumur mencapai 118%, realisasi Survei Seismik 3D mencapai 408% serta realisasi penambahan Contingent Resources (2C) yang mencapai 141%, besaran sumberdaya tersebut menunjukkan besaran sumberdaya yang siap untuk dikembangkan, pencapaian tersebut merupakan salah satu wujud kinerja eksplorasi yang massivedan aggressive untuk mendukung sustainability dan growthPHE Subholding Upstream. Adapun pencapaian realisasi Survei Seismik 2D dibawah target karena terdapat kendala perijinan pada seismik 2D Amalia di Regional 1 sementara seismik 2D Birds Headyang merupakan program KKPJM Open Area semula direncanakan di tahun 2023 akan dilaksanakan di tahun 2024, dikarenakan menunggu hasil evaluasi FTG dan sesuai program WP&B.Akuisisi Wilayah Kerja (WK) BaruPada tahun 2023, telah ditandatangani 3 Wilayah Kerja (WK) baru di Indonesia yaitu WK East Natuna, WK Peri Mahakam dan WK Bunga, dengan estimasi total potensi sumber daya sebesar 4,9 BBOE. Tiga WK tersebut diperoleh sebagai hasil dari studi dan evaluasi data kegiatan Komitmen Kerja Pasti (KKP) Jambi Merang di Wilayah Terbuka. Penambahan WK Baru tersebut menjadi harapan baru untuk kegiatan eksplorasi PHE di luar dari WK yang sudah ada.In general, the operating performance of PHE Subholding Upstream Exploration Activities exceeded the target; compared to the achievements in 2022, the realization of Well Drilling reached 118%, the realization of 3D Seismic Surveys reached 408% and the realization of the addition of Contingent Resources (2C) which reached 141%, the amount of these resources indicates the amount of resources that are ready to be developed, this achievement is one form of exploration performance that massiveand aggressive to support the sustainability and growth ofPHE Subholding Upstream. The achievement of the realization of the 2D Seismic Survey is below the target due to licensing constraints in the Amalia 2D seismic in Regional 1 while the 2D Birds Head seismic which is a KKPJM Open Area program was originally planned for 2023 is to be carried out in 2024, due to waiting for the results of the FTG evaluation and in accordance with the WP&B program.Acquisition of New Working Areas (WA)In 2023, three (3) new Working Areas (WA) have been signed in Indonesia, namely East Natuna Block, Peri Mahakam Block and Bunga Block, with an estimated total resource potential of 4.9 BBOE. The three WA were obtained as a result of the study and evaluation of data on Jambi Merang Definite Work Commitment (KKP) activities in the Open Area. The addition of the New WA has brought new hope for PHE exploration activities outside of the existing Working Areas. PT Pertamina Hulu Energi %u2022 Annual Report 171
                                
   167   168   169   170   171   172   173   174   175   176   177