Page 191 - Demo
P. 191


                                    Tata Kelola Perusahaan yang BaikGood Corporate GovernanceTanggung Jawab Sosial PerusahaanCorporate Social ResponsibilityLaporan Keuangan KonsolidasianConsolidated Financial ReportPT Pertamina Hulu Energi2020 Laporan Tahunan TerintegrasiIntegrated Annual Report 191TINJAUAN OPERASI PER SEGMEN USAHA Operation Overview per Business SegmentSurface Facility Project Advanced Development Optimization YY.YY%u2019s Field Development Optimization Plan (OPL) was prepared based on the results of the Minutes of Meeting of the Board of Directors (RRD) No. RRD-105/PHE000/2019-SO, dated December 30, 2019. This activity has considered the evaluation results of all aspects including subsurface, surface facility, drilling, estimated cost, project economics, financial performance, and risk analysis.The evaluation results concluded that the option to use the YYA-1RW relief well as a production well with an electric submersible pump (ESP) as an artificial lift and reuse the existing YYA platform is the best option to do. The YY field development optimization (OPL) start-up plan is expected in Q3 2022.Field Development Optimization (OPL) is aimed at producing ONWJ oil and gas of 2000 bopd and 1 mmscfd of gas (1.1 bbtud). This project is an addition to the existing drainage plan which will increase oil and gas reserves by 2.9 mmbo and 3.2 bscf (3.52 tbtu).Work progress until the end of 2020 for the progress of FID Revision Activities: 16.35%. Advance Engineering work progress (August - December 2020), Progress: Plan Re-baseline 89.74% vs 84.07% Actual, deviate -5.67%. Marine Survey Progress Work: 100% Plan vs 100% Actual, 0% deviate.KLD Field Development.The KLD field is part of the PHE ONWJ working area which is being developed. The success of drilling the KLU-1ST2 exploration well, which was exhausted in March 2012, as well as the remaining reserves from the KLD Field that could not be retrieved by existing platforms (KLA, KLB, or KLC) due to slot limitations, underlies PHE ONWJ to develop KLD and KLS structures.Proyek Surface Facility Optimasi Pengembangan Lanjutan YYRencana Optimasi Pengembangan Lapangan (OPL) YY ini dibuat berdasarkan hasil Risalah Rapat Direksi (RRD) No. RRD-105/PHE000/2019-SO, tanggal 30 Desember 2019. Kegiatan ini telah mempertimbangkan hasil evaluasi seluruh aspek termasuk subsurface, surface facility, drilling, estimate cost, keekonomian project,financial performance dan risk analysis.Hasil evaluasi menyimpulkan bahwa pilihan untuk menggunakan relief well YYA-1RW sebagai production well dengan electric submersible pump (ESP) sebagai artificial lift dan menggunakan kembali existing platformYYA merupakan opsi terbaik untuk dilakukan. Start-up rencana optimasi pengembangan lapangan (OPL) YY diperkirakan pada Q3 2022.Optimasi Pengembangan Lapangan (OPL) YY ditujukan untuk memproduksikan minyak dan gas ONWJ sebesar 2000 BOPD dan 1 MMSCFD gas (1.1 BBTUD). Projek ini merupakan penambahan dari rencana pengurasan existing yang akan menambah cadangan minyak dan gas sebesar 2.9 mmbo dan 3.2 bscf (3.52 TBTU).Progress pekerjaan sampai dengan akhir tahun 2020 untuk progress Aktivitas Revisi FID : 16.35%. Progress pekerjaan Advance Engineering (Agustus - Desember 2020), Progress : Plan Re-baseline 89.74% vs 84.07% Actual, deviate -5.67%. Pekerjaan Marine Survey Progress: Plan 100% vs 100% Actual, deviate 0%. KLD Field DevelopmentLapangan KLD merupakan bagian dari wilayah kerja PHE ONWJ yang sedang dikembangkan. Kesuksesan pengeboran sumur eksplorasi KLU-1ST2 yang lelah dilakukan pada bulan Maret 2012, serta sisa cadangan dari Lapangan KLD yang tidak bisa diambil dengan anjungan yang ada (KLA, KLB, atau KLC) karena keterbatasan slot, mendasari PHE ONWJ untuk mengembangkan struktur KLD dan KLS.
                                
   185   186   187   188   189   190   191   192   193   194   195