Page 197 - Demo
P. 197


                                    EntitasEntityLapanganFieldProgram Dekarbonisasi Decarbonization ProgramTahun InplaceInPlace YearEstimasi Penurunan Emisi (Ton CO%u2082 eq)Estimated Emission Reduction (Tons of CO%u2082eq)TotalTotalTotal Investasi (USD Ribu)Total Investment (USD Thousand)PHE OSESImplementasi penggunaan EJECTOR untuk pemanfaatan Casing Gas di Anjungan CINTA %u2013 E (Replikasi Inovasi PHE ONWJ)Implementation of Ejector Technology for Casing Gas Utilization at CINTA %u2013 E Platform (Replication of PHE ONWJ Innovation)Q2 2023 2.195,46 10,00PHE OSESPemanfaatan Gas Flare RAMA-P menggunakan Gas Compressor dan ejector di Anjungan RAMA-HUtilization of RAMA-P Flare Gas Using Gas Compressor and Ejector at the RAMA-H PlatformQ4 2024 4.191,04 3,84PHE OSESMengurangi Flaring dengan optimalisasi operasi GTG di PabelokanReducing Flaring through Optimization of GTG Operations at Pabelokan2022 9.933,60 1,00PHE OSESApplication of Solar Panels (PLTS) on Gas Metering Cilegon (6 kW)Application of Solar Panels (PLTS) on Gas Metering Cilegon (6 kW)Q1 2023 20,40 7,20PHE OSES Naturalisasi Bahan Bakar Kapal menjadi Diesel B35Transition of Vessel Fuel to Diesel B35Q1 2023 3.385,20 0,00PHE OSESPemanfaatan Gas Flare WIDURI-P menggunakan Gas Compressor Unit (GCU#2)Utilization of WIDURI-P Flare Gas Using Gas Compressor Unit (GCU#2)Q4 2024 1.564,89 1.100,00PHE OSES Application of Solar Panels (PLTS) on Pabelokan (130 kW)Q1 2024 442,84 318,00Zona 7Zone 7Field SubangPengurangan Gas Flare dengan Penggunaan Own Gas Compressor menggantikan menggantikan Mini Gas Composer - SP BBSReduction of Gas Flaring through the Use of Own Gas Compressor to Replace Mini Gas Compressor at SP BBSQ1 2024 64.213,2064.933,20550,00Field SubangPengurangan Unit Roadtank untuk transportasi Produced Water di SP BBS melalui pembangunan fasilitas water injectionReduction of Road Tanke Units for Produced Water Transportation at SP BBS through the Development of Water Injection Facilities2022 600,00 7.321,00Field TambunPembangunan Thermal Oil Heater Baru - SP TambunReduction of Roadtank Units for Produced Water Transportation at SP BBS through Development of Water Injection FacilitiesQ1 2024 120,00 278,400102030405060708 PHE's Commitment to Maintaining Sustainable Environment Komitmen PHE dalam Menjaga Lingkungan Lestari091011 PT Pertamina Hulu Energi 195
                                
   191   192   193   194   195   196   197   198   199   200   201