Page 165 - Demo
P. 165


                                    Tata Kelola Perusahaan yang BaikGood Corporate GovernanceTanggung Jawab Sosial PerusahaanCorporate Social ResponsibilityLaporan Keuangan KonsolidasianConsolidated Financial ReportPT Pertamina Hulu Energi2020 Laporan Tahunan TerintegrasiIntegrated Annual Report 165In 2020, the funneling process has made improvements by making Instructions Technical distribution (Juknis). Then in 2020, Thirty-five (35) funneling processes have been carried out and produce work plans for 2020-2021 namely Sungai Rotan, UKL Rancak 23B, UKL Mudi-25, Parang- 3 (Seismic update) and the 11th Seismic.In total lead maturation accelerated and the prospect of becoming a Ready to Drill Prospect (PSB) reaches total 477.78 MMBOE (Gross Pl P50 RR) or 8.55% of prospective total resources in the PHE Working Area Operators.Exploration Drilling Realization and TargetsIn 2020 the Directorate of Exploration implemented drilling of exploration wells as many as two wells or 50% of the RKAP target of four wells.Realization and Target Resources FindingAdditional realization definite resource (2C) already validated in 2020 to reach 56.14 MMBOE, or 157% of the target RKAP 35.7 MMBOE. Amount of these come from:%u2022 Exploration of well drilling (Organic) of 0.12 MMBOE, obtained from PHE Kampar%u2022 Re-certification and re-assessment or study as well undeveloped discovery and in fills of 56.02 MMBOE, obtained from the PHE Raja Tempirai area, PHE OSES, PHE Tuban, PHE Ogan Komering and PHE Salawati.Pada tahun 2020, secara proses bisnis funneling telah dilakukan penyempurnaan dengan dibuatnya Petunjuk Teknis (Juknis) funneling. Kemudian pada tahun 2020, telah dilaksanakan tiga puluh lima (35) proses funneling dan menghasilkan rencana kerja 2020-2021 yaitu usulan Sungai Rotan, UKL Rancak 23B, UKL Mudi-25, Parang-3 (Update seismik) dan Seismik KE-11.Secara keseluruhan percepatan maturasi lead dan prospek menjadi Prospek Siap Bor (PSB) mencapai total 477,78 MMBOE (Gross PI P50 RR) atau 8,55% dari keseluruhan prospektif sumber daya di WK PHE Operator.Realisasi dan Target Pemboran EksplorasiTahun 2020 Direktorat Eksplorasi merealisasikan pemboran sumur eksplorasi sebanyak dua sumur atau 50% dari target RKAP sebanyak empat sumur.No Lokasi SumurWells LocationWilayah KerjaWorking AreaPengelolaDeveloper1 Sumur WMA-1 WMA-1 WellBlok Tuban East JavaTuban East Java BlockPHE Tuban East Java2 Sumur Parang-2 Parang-2 WellBlok NunukanNunukan BlockPHE Nunukan CompanyRealisasi Pemboran Sumur Eksplorasi PHE Tahun 2020Realization of PHE%u2019s Drilling Wells Exploration in 2020Realisasi dan Target Temuan Sumber Daya [OG1]Realisasi tambahan pasti sumber daya (2C) yang sudah tervalidasi pada tahun 2020 mencapai 56,14 MMBOE, atau 157% dari target RKAP 35,7 MMBOE. Jumlah tersebut berasal dari:%u2022 Pemboran sumur eksplorasi (Organik) sebesar 0,12 MMBOE, didapat dari PHE Kampar.%u2022 Re-sertifikasi dan re-assessment atau studi maupun undeveloped discovery dan infills sebesar 56,02 MMBOE, didapat dari area PHE Raja Tempirai, PHE OSES, PHE Tuban, PHE Ogan Komering dan PHE Salawati.TINJAUAN OPERASI PER SEGMEN USAHA Operation Overview per Business Segment
                                
   159   160   161   162   163   164   165   166   167   168   169