Oil and Gas

TechnologyFunctionCreation
Interstage SeparatorDECREASING LOSS OF OIL AND GAS PRODUCTION BY USING THE INTERSTAGE SEPARATOR AT UNINHABITATED OFFSHORE PLATFORM OF ECHO FIELD EJ OF PT PHE ONWJ.
Installation of a system capable of removing concentrates and hydrates in the gas instrument system and reducing unplanned shutdowns. This system can prevent loss of revenue of IDR 3.5 Billion
FT- Prove JoePRI PHE ONWJ
Si VerdOPTIMIZING THE VERIFICATION METHOD OF THE GAS LEGAL CALCULATION SYSTEM BY DEVELOPING AND APPLYING "SI VERDI" IN PT PHE ONWJ's ONSHORE RECEIVING FACILITY.
The verification process is 1 second faster (real time) and managed to save IDR 48 million and the intensity of work on the site was reduced from 9 times to 3 times.
I Prove Juniz PHE ONWJ
Big-D SparkIMPROVING THE RELIABILITY OF TEG REBOILER BY CREATING “BIG-D SPARK” IN OPF BALONGAN PHE ONWJ
Eliminating potential Fatality and secure production of 2.9 billion/day while maintaining customer satisfaction
PHE ONWJ